Saturday, 21 March 2015

Build Issues - Frame Stage (Wall)

Hi all,

I spotted a few more 'build issues' I need to add to the list so I thought I would share.

Here are the new issues I will raise: 

- Frame fastening bolt does not meet BCA tolerance and has cracked the edge of the slab due to the insertion angle


- Frame over hang to the rear of the garage. Approximately 80 mm. Something is seriously wrong here but I'm sure it will get rectified accordingly. 



- Replacement storm water pipe looks to be in the wrong position as the brick face the downpipe will be positioned on is only 450 mm wide, where as the pipe is 700 mm inwards from the edge of the garage. This places it right in front of the rear roller door. 




Fish Tank 'Alcove'

As most of you may already know, I have utilized one of the rooms (study) and turned it into a 'fish room' with an in-wall fish tank. 

Today I went out and made sure the alcove was built to the measurements I specified. I was glad to see that the framers got it 100% accurate as I asked. 

My only concern is that the measurements I gave have been used as frame to frame measurements. Where as I wanted them to be between plaster.

Can anybody advise how thick the standard plaster used is? 







Friday, 20 March 2015

Framing - Walls complete

Wall framing is now complete. 

I had a quick look yesterday and took a few photos. Looks like a really clean job and I have only spotted one issue so far (overhang rear at the rear entrance of the garage) but will check it all in more detail Saturday morning.








Wednesday, 18 March 2015

Framing

This morning I went out just before work to have a look at the progress and take a quick photo of our site.

I was surprised to see that all the tradesmen were already on site at 7am!


Tuesday, 17 March 2015

'Intro' call from our Site Supervisor - Frame Started

This afternoon we got a surprise call from our SS (Site Supervisor).

He called to introduce himself and advise that he has officially taken over from the Slab Supervisor. We were also happy to hear that the framing for the walls will be complete by C.O.B tomorrow.

Unfortunately, there is a delay with the supply of the roof trusses meaning framing won't be complete till the end of this month.

He asked if I have any questions and I briefly mentioned the unresolved issues we still have outstanding. Seems that he will follow them up first thing tomorrow. Was very happy to hear that!

Cheers!

Sunday, 15 March 2015

Framing materials delivered

We went out for a look at our site today and we were happy to see that some framing materials have been delivered :)

Here are some photos:






Slab - Areas of concern marked

Hi all,

Just a few photos showing the marking I did on the slab today. Our Slab Supervisor agreed that I go on-site and mark the areas I would like repaired. I bought a 'Spay & Mark' can from burnings which is commonly used in the construction and surveying industry. 

I also noticed a few more areas that needs attention. I will add those pictures at the end of this post.















Cracked slab edge near garage entry roller door.


Foam pod showing through bath tub hole in the slab.