We received a second valuation from another company and thankfully it came in higher than the previous one. Even though it would have been better to get the full construction amount we are much better off now.

I am leaving for a business trip tomorrow and won't be back till December. We're predicting that the slab will not be poured until then but have already organized an Independent Inspector in case we get to slab stage during my absence.

As of today this is what's pending:
  • Developer Design Approval
  • Final loan approval (construction)
  • Land Title and Settlement 
  • 2nd Soil test after Title
  • Building permits
  • Final construction drawings
  • Post Contract Variation document

Unfortunately all the above will happen throughout November so my Fiance will be quite busy on her own.