Being used to the lack of communication from previous PD staff I have dealt with (our first Building Co-ordinator) I was expecting a short conversation and to be 'snubbed off'. Boy was I wrong!
He (Slab supervisor) was very helpful and took as much time as required to answer all my questions and concerns. Here are some of the questions/concerns I had and the answers I was given:
1. Foundation quality of work: I was assured that he has selection of contractors that he has worked with closely before and only accepts high quality of work from them. He also explained that the slab built by PD uses almost 9 tonne of steel instead of the minimum requirement of 6 tonne for a similar build to mine.
2. Slab heave: He told me that he has had lots of experience with slab heave (even with his personal property) and that he believes that there are many factors to the cause of this. The factors he raised were site drainage (tick!), quality of foundation work (tick!) and correct design of slab including reinforcement amount (tick!). He has ensured me that all pre-cautions will be taken to build a high quality foundation for our home with correct site drainage.
3. Slab pour date/pre-pour inspection: He was more than happy for me to pass his details to our Independent Inspector (Darbecca) for them to co-ordinate the pre-pour inspection without me being a 'messenger boy'. The slab pour date is expected on 03/03/2015.
I must say, I was quite impressed and relieved after this conversation. Of course I couldn't note down the entire ~30mins phone call but the above points cover the most important topics.
Here's hoping that all goes well with our foundation work and slab pour. After all, it is the most important part of the house.
No comments:
Post a Comment