Saturday, 2 May 2015

Site Visit - Another 5 items added to our build issues list

All week we had both been very excited for today. My parents were coming down to Melbourne and we were going to meet them at the house. We did and it was great to show them through the house so they could finally see what we had been trying to explain on paper (Drawings) for the past year.

Unfortunately, we picked up another 5 items to add to our build issues list (20 outstanding). Some are big mistakes on PD's behalf. Hope to get these rectified sooner rather than later. 
  1. Cavity slider door to WIP (Walk In Pantry) is not centred. The drawings show that the right hand side wall needs to be 580 mm  wide. This measurement needs to be taken from the inside wall. The framers (even though marked on the ground) decided to take the measurement from the outside wall which includes the hallway stud wall. The result? See for yourself... 




2. Wrong window installed to our Master bedroom. It should be a split awning window. What has been installed is definitely not that and looks so odd from the front of the house. 




3. Noggin damaged at recirculated air recess


4. Noggins to bedroom 4 have not been replaced as promised during frame stage


5. Front awning window to storage room has been damaged. 