This afternoon (3 pm) will be our pre-pour/foundation inspection. So yesterday we went to the block and to our surprise boxing had not yet been started.
We did notice that some 'prep work' was done. Pier holes drilled (not filled), gravel laid over site and step downs re-introduced. It seems that whilst they were drilling the piers they damaged the plumbing for the laundry drain. They also damaged the plumbing for the down pipe on the garage external door side. I've made our Slab Supervisor and Building Co-ordinator aware of these and we have been told that they will be rectified by this afternoon.
Apparently it takes less than a full day to box the site for slab pour.... Let's wait and see if that happens.
Holes for piers drilled. Laundry drain missing.
Damaged downpipe drain near garage external entry door. Drain for 'study' room in the garage.
No comments:
Post a Comment